H.O.P.E. 2002 THE
YEAR IN REVIEW – “CHANGES”/”IMPROVEMENTS”
- New shed was constructed
- New shelter was built
- Electrical Outlet
installed on side of building
- 1000’s of bricks, tons of sand and gravel,
were used to contract the walkway by the shelter
- New picnic table
built
- New marquee sign
built – with “Welcome to H.O.P.E.” lettering
- Concrete poured around the bases of the 46
galvanized poles – fencing (outdoor courts)
- Concrete curb
poured
- 45 tons
of top
soil trucked in
- Equipment box
built for shovels, scoreboards, tampers, etc. (outdoor courts)
- Riding lawn
mower donated to the club
- Toro Snow Blower
purchased
- Leaf Blower
purchased
- 16 new
Social Members
joined the club in 2002
- Rally Day
– September 13, 2002 – 8 new members joined the club (84 guests
participated)
- Property
was resurveyed
- H.O.P.E.
lettering was installed on the front
of the building
- Social Members
now permitted to attend the quarterly meetings
- A 6 month
membership is now available
- Job descriptions
for the Board of Directors
FUTURE PROJECTS FOR
2003
- Court #9
to be constructed (outdoor courts)
- Extend
the shelter along the side of the
building
- Spread
30 tons of topsoil, plant grass
seed, spread hay
- Change
the lighting inside the building
(more cost efficient lighting)
- Paint the side of the building where shelter
exists
- Driveway repaired/repaved
- Parking lot
gravel added